Experience is what you get right after you needed it.
Four Months of Galloping Gertie
When the Tacoma Narrows Bridge opened across Puget Sound on July 1, 1940, it was celebrated as a sleek, economical triumph. To save steel, designer Leon Moisseiff replaced deep open trusses with shallow, solid eight-foot plate girders. The roadway rippled so noticeably in mild breezes that drivers nicknamed it "Galloping Gertie" before the paint dried.
On the morning of November 7 - just four months after opening - a steady forty-two-mile-per-hour wind locked the span into violent aeroelastic flutter, twisting the asphalt forty-five degrees until cables snapped and the center deck plunged into the sound. Every major suspension bridge built afterward underwent wind-tunnel testing for flutter. The lesson was priceless, and it arrived four months too late for Gertie.
Source: Tacoma Narrows Bridge collapse, November 7, 1940 (opened July 1, 1940; 42 mph wind, aeroelastic flutter); Washington State DOT & APS.