Skip to main content
Obvious Baba by TheWORKCompany
Obvious Baba
Everyday Truths
Obvious Truth #112 of 173

Experience is what you get right after you needed it.

The Story Behind This

Four Months of Galloping Gertie

Engineering
~53 sec listen

When the Tacoma Narrows Bridge opened across Puget Sound on July 1, 1940, it was celebrated as a sleek, economical triumph. To save steel, designer Leon Moisseiff replaced deep open trusses with shallow, solid eight-foot plate girders. The roadway rippled so noticeably in mild breezes that drivers nicknamed it "Galloping Gertie" before the paint dried.

On the morning of November 7 - just four months after opening - a steady forty-two-mile-per-hour wind locked the span into violent aeroelastic flutter, twisting the asphalt forty-five degrees until cables snapped and the center deck plunged into the sound. Every major suspension bridge built afterward underwent wind-tunnel testing for flutter. The lesson was priceless, and it arrived four months too late for Gertie.

Source: Tacoma Narrows Bridge collapse, November 7, 1940 (opened July 1, 1940; 42 mph wind, aeroelastic flutter); Washington State DOT & APS.